Seblu, Tihtina and Tesfaye, Kibrom and Kahsay, Yordanos (2010) Project Follow Up System in Addis Ababa Building Project. Undergraduate thesis, Addis Ababa University.
PDF (Project Follow up System in Addis Ababa Building Project)
Seblu, Tihtina – Tesfaye, Kibrom – Kahsay, Yordanos.pdf - Accepted Version Restricted to Repository staff only Download (561kB) | Request a copy |
Abstract
This study tries to identify the practice and challenges of project follow-up system in Addis Ababa building projects. The study begins with review of the important aspect of project follow-up system. It then takes a survey study analysis to identify the current practice and challenges of project follow-up system. It further tries to address what has to be done to improve follow up system practice and tried to suggest improved type of follow up system to control cost overrun, time delay, poor quality and workmanship.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Construction Technology and Management |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management H Social Sciences > HJ Public Finance T Technology > T Technology (General) T Technology > TH Building construction |
Divisions: | Africana |
Depositing User: | Andriamparany Edilbert RANOARIVONY |
Date Deposited: | 19 Jul 2018 14:07 |
Last Modified: | 19 Jul 2018 14:07 |
URI: | http://thesisbank.jhia.ac.ke/id/eprint/7828 |
Actions (login required)
View Item |