Number of items at this level: 45.
A
Abdela, Nejbel Mohaamed
(2014)
A Study on Planning and Scheduling in Federal Road Projects of Ethiopia : Causes of Non-Excusable Delay in Selected Projects.
Masters thesis, Addis Ababa University.
Addisu, Solomon
(2009)
Assessment of the Impact of Road Construction on Physical Land Degradation in Central Highlands of Ethiopia: The Case of Two Selected Projects.
Masters thesis, Addis Ababa University.
Adoyo, Felix Otieno
(2012)
Pavement Evaluation of Mbagathi Road, Kenya.
Masters thesis, University of Nairobi.
Ahmed, Tamrayehu Kurema
(2016)
Safety at Platform-Train Interface (PTI) and Pedestrian-Rail Crossings of the Addis Ababa Light Rail Transit (AALRT).
Masters thesis, Addis Ababa University.
Alemayehu, Shihunegn
(2014)
Testing Regression Models to Estimate Costs of Road Construction Projects.
Masters thesis, Addis Ababa University.
Anteneh, Fentahun
(2011)
Mining Road Traffic Accident Data for Predicting Accident Severity to Improve Public Health – Role of Driver and Road Factors in the Case of Addis Ababa.
Masters thesis, Addis Ababa University.
Ashuro, Tesfahun
(2010)
Performance of Unconventional Soil Stabilizers in Stabilization of Substandard Materials for Road Subgrade & Subbase.
Masters thesis, Addis Ababa University.
Asrat, Sophonyas
(2013)
Simplified Analysis and Design Considerations of Precast Joist in One Way Ribbed Slab.
Masters thesis, Addis Ababa University.
Asrat, Yoseph
(2015)
Descriptive Analysis of Road Traffic Crashes in Addis Ababa.
Masters thesis, Addis Ababa University.
Ayalew, Tadesse
(2009)
Causes and Effects of Variations in Ethiopian Federal Road Projects.
Masters thesis, Addis Ababa University.
B
Bayou, Yonnas
(2009)
Strength Evaluation of Existing Bridges.
Masters thesis, Addis Ababa University.
Bekele, Nora Mulualem
(2017)
Performance Assessment of Road Drainage Systems of Burayu Town.
Masters thesis, Addis Ababa University.
Bekele, Samuel
(2014)
Assessment on Prolongation Cost Estimation Practice for Road Construction Projects in Ethiopia.
Masters thesis, Addis Ababa University.
Belay, Momona
(2015)
Assessment of Road Construction in Ethiopian Rainy Seasons.
Masters thesis, Addis Ababa University.
Belay, Shewaferaw Dinku
(2006)
The Use of Manufactured Sand in Concrete Production: Test Results and Cost Comparison.
Masters thesis, Addis Ababa University.
Beshah, Tiruye
(2013)
Underpass Pedestrian Crossing Connecting the Two Campuses of Addis Ababa Institute of Technology.
Masters thesis, Addis Ababa.
C
Cherkos, Adugna
(2014)
Assessment of Knowledge, Attitude and Practice Toward
First Aid Related to Road Traffic Accidents among Traffic
Police in LIDETA, KIRKOS and ARADA Sub City of Addis
Ababa, Ethiopia.
Masters thesis, Addis Ababa University.
D
Dagim, Yoseph
(2009)
Modeling Traffic Flow Problem: Comparison of Multilane Roundabout Versus Traffic Light Control.
Masters thesis, Addis Ababa University.
Desalegn, Yitagesu
(2012)
Developing Correlation between DCP and CBR for Locally Used Subgrade Materials.
Masters thesis, Addis Ababa University.
Dinsa, Yadessa
(2015)
Assessment of the Causes and Effects of Price Escalation of Federal Road Contracts in Ethiopia.
Masters thesis, Addis Ababa University.
E
Endeshaw, Yilkal
(2013)
Harmonization of Light Rail Transit and Principal Arterial Streets (A Case Study on the Addis Ababa East-West LRT System and Principal Arterial Streets).
Masters thesis, Addis Ababa University.
Eshete, Yitayou
(2011)
Blending of Cinder with Fine-Grained Soil to be Used as Sub-Base Materials (The Case of Butajira-Gubre Road).
Masters thesis, Addis Ababa University.
Eshetu, Tegegne
(2011)
Methodology for Traffic Safety Audit and Inspection of Bridges.
Masters thesis, Addis Ababa University.
G
Gebrehiwot, Nebiyu Giday
(2014)
Evaluation of Dynamic Cone Penetrometer (DCP) for Purpose of Soil Investigation for Low Volume and Inaccessible Road Design.
Masters thesis, Addis Ababa University.
Getachew, Solomon Tewodros
(2007)
Capacity Evaluation of Roundabout Junctions In Addis Ababa.
Masters thesis, Addis Ababa University.
Gezahegne, Samuel
(2016)
Approximate and Grillage Analogy Methods of Analysis of RC T and Box Girder Bridges - Comparative Study.
Masters thesis, Addis Ababa University.
Girmay, Temesgen
(2016)
Asphalt Road Pavement Rehabilitation and Maintenance Case Study in Addis Ababa City Roads Authority.
Masters thesis, Addis Ababa University.
H
Haile, Tsegay
(2016)
Comparative Evaluation of Project Performance between Domestic and Chinese Contractors in Selected Federal Road Projects in Ethiopia.
Masters thesis, Addis Ababa.
J
Jano, Simeneh Merga
(2012)
Investigation of the Performance of Unsealed Road Sub Base Materials Used as Wearing Course of Gravel Road (In The Case of Kamashi –Yaso Road).
Masters thesis, Addis Ababa University.
K
Kassa, Yifred
(2013)
Performance Assessment of Road Drainage Structures and Proposed Mitigation Measures: The Case of Daleti-Odagodere Gravel Road in Benishangul-Gumuz Region.
Masters thesis, Addis Ababa University.
M
Mehari, Zemichael Berhe
(2007)
Effect of Different Types of Filler Materials on Characteristics of Hot-Mix-Asphalt Concrete.
Masters thesis, Addis Ababa University.
Mekbib, Selamawit
(2015)
Investigation on Some of Engineering Properties of Soils Found in Sebeta Town.
Masters thesis, Addis Ababa University.
Melaku, Sintayehu
(2015)
Economic Design of Steel Concrete Composite Bridges.
Masters thesis, Addis Ababa University.
Minalu, Yonas
(2014)
Performance Evaluation of Addis Ababa City Road Network.
Masters thesis, Addis Ababa University.
Mossa, Mohammed Gashaw
(2013)
Assessment of Price Escalation and Adjustment Problems on Federal Road Construction Projects.
Masters thesis, Addis Ababa University.
N
Nigussie, Adamu Seyfe
(2016)
Computer Program for Comaprative Study of the Analasis and Design of Prestressed Concrete Box Girder and Plate Girder Highway Bridges.
Masters thesis, Addis Ababa University.
Nyatwang’a, Walter Barongo
(2013)
Determinants of Implementation of Environmental Management Strategies of Public Organizations in Road Construction Sector in Kenya.
Masters thesis, Kenyatta University.
S
Sebero, Solomon Shanko
(2015)
Segmental Assessment Oflevel of Traffic Congestion on Kality Ring Road to Dukem Bridge.
Masters thesis, Addis Ababa University.
Syum, Tewodros
(2014)
Highway Development and Management Model – 4 (Hdm-4) Calibration (Addis Ababa – Modjo Trunk Road Case).
Masters thesis, Addis Ababa University.
T
Taddesse, Wondwossen
(2011)
Assessing & Quantifying the Level of Traffic Congestion at Major Intersections in Addis Ababa.
Masters thesis, Addis Ababa University.
Tadesse, Asnake
(2006)
Road Freight Transport in Ethiopia with Special Emphasis on Addis Ababa – Djibouti Corridor.
Masters thesis, Addis Ababa University.
Tariku, Rahel
(2016)
Project Delivery Systems and their Effects on Cost and Time Overrun on Ethiopian Road Authority Projects.
Masters thesis, Addis Ababa University.
Tegabu, Temesgen
(2015)
Right of Way Risk Management of Road Construction Projects in Urban Areas: A Case Study of Addis Ababa.
Masters thesis, Addis Ababa University.
Teklu, Webeshet
(2015)
Effect of Gradation of Aggregates on the Rutting Performance of Hot Mix Asphalt.
Masters thesis, Addis Ababa.
Y
Yazew, Selam
(2015)
Study of Plastic Soil Cement for Flooring Application.
Masters thesis, Addis Ababa University.
This list was generated on Sun Dec 22 01:44:20 2024 EAT.